Water and Sewer Services
The Township of Red Rock has established a policy outlining the rates and responsibilities regarding maintenance and repair of municipal sewer and water services. To review this policy and related work orders, please click here.
Township of Red Rock Waste Water Treatment Plant
Environmental Study Report
Appendix A - Notification to Public & Review Agencies
Appendix B - Correspondence & Comments Received
Appendix C - Public Consultation Centre (PCC) Displays
Appendix D - Inflow & Infiltration Study
Appendix E - RRWWTP Condition Assessment
Appendix F - Geotechnical Investigation Report
Appendix G - Bio Consulting Report
Appendix H - Arhaeological Background Study
Appendix I - Official Plan Drawings
Appendix J - Population Projection & Flow Calculations
Appendix K - Cost Breakdown
Fig. 1.1 - Class EA Flowchart
Fig 2.1 - Site Plan
Fig. 2.2 - Historical Average Daily Flows
Fig. 2.3 - Red Rock Water Pollution Control Plant Process Schematic
Fig. 2.4 - Potential WWTP Sites - Land Use Constraints
Fig. 2.5 - Potential WWTP Sites - Environmental Constraints
Fig. 4.1 - Site Plan for RBC Plant
Other Links
Municipal Service Charges
Township of Red Rock Water Ontario Regulation 453/07 Financial Plan
Quality Management System Policy for the Red Rock Drinking Water System
2016-2017 Municipal Water Works Inspection Report for the Red Rock Drinking Water System
Red Rock Drinking Water System Operational Plan
*Water Treatment Plant Annual Summary Report is avaliable for viewing at the Municipal Office during office hours.
Residential Water and Sewer Rates
Year | Minimum Bill | Volumetric Charge |
---|---|---|
2018 | $44.18 | $1.94 |
2019 | $45.06 | $1.98 |
2020 | $45.96 | $2.02 |
*Minimum Bill and Volumetric Charge will be split: Water – 62.00% Sewer – 38.00%
Multi-Residential Water and Sewer Rates and Fees
Year | Minimum Bill | Volumetric Charge |
---|---|---|
2017 | $15.71 per unit | $1.90 |
2018 | $20.00 per unit | $1.94 |
2019 | $21.00 per unit | $1.98 |
2020 | $22.00 per unit | $2.02 |
*Minimum Bill and Volumetric Charge will be split: Water – 62.00% Sewer – 38.00%